Dream panorama! Make the exceptional your place of residence!
This 5.5 room penthouse is located on the top floor of building D2.
It is composed as follows: Direct entrance by elevator into the 13m2 entrance hall with wall cupboard, kitchen with central island open to the large living room with panoramic view of the lake and access to the 168m2 rooftop terrace.
Four bedrooms including a 26.4m² master bedroom with dressing area and en-suite shower room and an 18.3m² junior suite with dressing area and en-suite bathroom. A shower room/WC and a laundry room complete this floor. A cellar completes this property.
Two indoor parking spaces (CHF 120,000 extra) complete this property.
The PPE charges for this lot are estimated at CHF 1,092.
THE ADVANTAGES:
- Minergie P Eco label
- Geothermal probe heat pump
- Photovoltaic panels to reduce the cost of your energy bill
- Ventilation: double flow system
- Room thermostat in all rooms
- Construction by the General Contractor BERNARD NICOD SA
DELIVERY OF BUILDINGS:
D1 – D2 = 30.05.2025
D3 = 30.04.2025
B2 = 30.06.2025
B1 Center = 09/30/2025
B1 West = 10/31/2025
Information and visits: Alexandra JEREZ & Tania LEITE
This 5.5 room penthouse is located on the top floor of building D2.
It is composed as follows: Direct entrance by elevator into the 13m2 entrance hall with wall cupboard, kitchen with central island open to the large living room with panoramic view of the lake and access to the 168m2 rooftop terrace.
Four bedrooms including a 26.4m² master bedroom with dressing area and en-suite shower room and an 18.3m² junior suite with dressing area and en-suite bathroom. A shower room/WC and a laundry room complete this floor. A cellar completes this property.
Two indoor parking spaces (CHF 120,000 extra) complete this property.
The PPE charges for this lot are estimated at CHF 1,092.
THE ADVANTAGES:
- Minergie P Eco label
- Geothermal probe heat pump
- Photovoltaic panels to reduce the cost of your energy bill
- Ventilation: double flow system
- Room thermostat in all rooms
- Construction by the General Contractor BERNARD NICOD SA
DELIVERY OF BUILDINGS:
D1 – D2 = 30.05.2025
D3 = 30.04.2025
B2 = 30.06.2025
B1 Center = 09/30/2025
B1 West = 10/31/2025
Information and visits: Alexandra JEREZ & Tania LEITE