The building is currently under construction, lot 11 is a lovely 2.5 room apartment on the 2nd floor with a weighted surface area of 66.8 m². Crossing, it occupies the center right of the residence (entrance B) and benefits from a 19.2 m² balcony facing southwest.
This new development, called PPE Tramenaz, will be located in the highly sought-after town of La Tour de Peilz, less than 500 meters from Lake Geneva. This high-quality Minergie construction will consist of two main entrances for 18 dual-aspect apartments of 2.5, 3.5, and 4.5 rooms. Boasting contemporary lines, this elegant project has been designed to comfortably optimize the interior layout while benefiting from its ideal southwest exposure through floor-to-ceiling windows.
Delivery March 2026.
This new development, called PPE Tramenaz, will be located in the highly sought-after town of La Tour de Peilz, less than 500 meters from Lake Geneva. This high-quality Minergie construction will consist of two main entrances for 18 dual-aspect apartments of 2.5, 3.5, and 4.5 rooms. Boasting contemporary lines, this elegant project has been designed to comfortably optimize the interior layout while benefiting from its ideal southwest exposure through floor-to-ceiling windows.
Delivery March 2026.