This hotel-restaurant enjoys a strategic location, at the foot of the slopes and ski lifts of Les Crosets, in the heart of the Portes du Soleil ski area. It is located on a plot of ~3,052m2 currently in a medium-density zone (Les Crosets sector).
Its privileged location gives it optimal visibility, a breathtaking view of the Dents-du-Midi as well as exceptional sunshine.
Its panoramic terrace also attracts guests with its exceptional view. Its year-round car access and numerous indoor and outdoor parking spaces are additional assets.
Main features:
+ Hotel with 21 rooms (63 beds)
+ 6-room company apartment (6 beds)
+ Restaurant: ~100 indoor seats + ~130 terrace seats
+ Bar: ~130 indoor seats + ~100 terrace seats (parking)
+ Underground parking (2 levels): ~55 indoor parking spaces
+ Outdoor parking: ~40 outdoor parking spaces
+ Volume of the above-ground building (SIA 416): ~5,710m3
+ Volume of parking lots: ~6,710m3
+ Total volume (SIA 416): ~12,420m3
+ Hotel/restaurant floor area: ~1,280m2
+ Parking floor area: ~1,740m2
+ Total floor area: ~3,020m2
This idyllic location is ideal for ski enthusiasts, as well as hiking and mountain biking enthusiasts. It offers an unforgettable alpine experience in the heart of one of Europe's largest ski resorts (approximately 650 km of slopes), both in winter and summer.
Located at an altitude of ~1,670m, the establishment benefits from good snow cover throughout the winter season, in particular thanks to the construction of a hill reservoir of nearly 100,000m3 of water.
Built in 1967, the establishment has since benefited from renovations/expansions, including a non-exhaustive list:
+ 2025: Renovation of electric door (access to terrace from restaurant)
+ 2025: Door replacement (between bar and fireplace)
+ 2022: Room renovation
+ 2021: Interior elevator renovation
+ 2020: Self-service transformation into a bar
+ 2020: Replacement of professional clothes dryer (gas)
+ 2020: Revision of freezer/cold rooms (ground floor)
+ 2008: Restaurant + kitchen renovation
+ 2007: Waterproofing renovation and exterior painting
+ 2005: Replacement of windows and insulation of gable facades
+ 2003: Waterproofing and bituminous coating renovation
+ 2002: Elevator installation (replacement/repair required)
+ 1999: Construction of underground parking, rear storage rooms and adjoining rooms
+ 1997: Heating replacement (oil)
+ 1975: Transformation of dormitories into a hotel
+ 1967: Construction of self-service, restaurant and dormitory accommodation
The building is divided into 4 parts:
1) Basement: 2 levels of parking with elevator
2) Ground floor: Ski-accessible bar (former self-service)
3) 1st floor: Restaurant with panoramic terrace accessible by two external staircases and the elevator
3) 2nd, 3rd floor and attic: Hotel
MISCELLANEOUS
+ Hotel credit: A hotel credit application was made by the former operators in 2023. This was accepted by the Swiss Hotel Credit Company (SCH).
+ Building taxation: A property taxation was carried out in 2012. The value of the building was set at CHF 4,253,000 (see taxation of the architect's office in question dated April 25, 2012).
COMPLETE PRESENTATION FILE AND ADDITIONAL DOCUMENTS AVAILABLE
+ 2025: Parking management system quote
+ 2024: Inspection report for fire protection
+ 2024: Quote for fire detection installation + electricity
+ 2024: CECB+ quote
+ 2023: AEAI compliance quote
+ 2023: Report of the audit body
+ 2023: Economic viability analysis
+ 2022: Roof replacement quote
+ 2022: OIBT control
+ 2012: Taxation report
PARTIAL VIRTUAL TOUR AVAILABLE
Visit without leaving your home!
Its privileged location gives it optimal visibility, a breathtaking view of the Dents-du-Midi as well as exceptional sunshine.
Its panoramic terrace also attracts guests with its exceptional view. Its year-round car access and numerous indoor and outdoor parking spaces are additional assets.
Main features:
+ Hotel with 21 rooms (63 beds)
+ 6-room company apartment (6 beds)
+ Restaurant: ~100 indoor seats + ~130 terrace seats
+ Bar: ~130 indoor seats + ~100 terrace seats (parking)
+ Underground parking (2 levels): ~55 indoor parking spaces
+ Outdoor parking: ~40 outdoor parking spaces
+ Volume of the above-ground building (SIA 416): ~5,710m3
+ Volume of parking lots: ~6,710m3
+ Total volume (SIA 416): ~12,420m3
+ Hotel/restaurant floor area: ~1,280m2
+ Parking floor area: ~1,740m2
+ Total floor area: ~3,020m2
This idyllic location is ideal for ski enthusiasts, as well as hiking and mountain biking enthusiasts. It offers an unforgettable alpine experience in the heart of one of Europe's largest ski resorts (approximately 650 km of slopes), both in winter and summer.
Located at an altitude of ~1,670m, the establishment benefits from good snow cover throughout the winter season, in particular thanks to the construction of a hill reservoir of nearly 100,000m3 of water.
Built in 1967, the establishment has since benefited from renovations/expansions, including a non-exhaustive list:
+ 2025: Renovation of electric door (access to terrace from restaurant)
+ 2025: Door replacement (between bar and fireplace)
+ 2022: Room renovation
+ 2021: Interior elevator renovation
+ 2020: Self-service transformation into a bar
+ 2020: Replacement of professional clothes dryer (gas)
+ 2020: Revision of freezer/cold rooms (ground floor)
+ 2008: Restaurant + kitchen renovation
+ 2007: Waterproofing renovation and exterior painting
+ 2005: Replacement of windows and insulation of gable facades
+ 2003: Waterproofing and bituminous coating renovation
+ 2002: Elevator installation (replacement/repair required)
+ 1999: Construction of underground parking, rear storage rooms and adjoining rooms
+ 1997: Heating replacement (oil)
+ 1975: Transformation of dormitories into a hotel
+ 1967: Construction of self-service, restaurant and dormitory accommodation
The building is divided into 4 parts:
1) Basement: 2 levels of parking with elevator
2) Ground floor: Ski-accessible bar (former self-service)
3) 1st floor: Restaurant with panoramic terrace accessible by two external staircases and the elevator
3) 2nd, 3rd floor and attic: Hotel
MISCELLANEOUS
+ Hotel credit: A hotel credit application was made by the former operators in 2023. This was accepted by the Swiss Hotel Credit Company (SCH).
+ Building taxation: A property taxation was carried out in 2012. The value of the building was set at CHF 4,253,000 (see taxation of the architect's office in question dated April 25, 2012).
COMPLETE PRESENTATION FILE AND ADDITIONAL DOCUMENTS AVAILABLE
+ 2025: Parking management system quote
+ 2024: Inspection report for fire protection
+ 2024: Quote for fire detection installation + electricity
+ 2024: CECB+ quote
+ 2023: AEAI compliance quote
+ 2023: Report of the audit body
+ 2023: Economic viability analysis
+ 2022: Roof replacement quote
+ 2022: OIBT control
+ 2012: Taxation report
PARTIAL VIRTUAL TOUR AVAILABLE
Visit without leaving your home!